+48 12 645 16 15 hepamos@hepamos.com.pl

DATE OF IMPLEMENTATION: 2018

ADDRESS: Rzeplin, Zorawina commune

INVESTORGmina Żórawina, ul. Kolejowa 6, 55-020 Żórawina

DESCRIPTION:
In 2018, our company – as general contractor, designed and carried out a complete school facility with a surface of approximately 240m2. The school includes classrooms, a staffroom, toilet rooms and a cloakroom. Toilet rooms for girls, boys and for disabled people were made. Outside the building, land development works and parking spaces were carried out. The facility was connected to external utility systems and made with complete internal installations, including:

  • wiring
  • water pipes
  • sewage system
  • air-conditioning
  • heating
  • mechanical ventilation

Obiekt uzyskał pozwolenie na użytkowanie i spełnia wszystkie warunki techniczne wymagane w budynkach użyteczności publicznej.

Zamknij menu